THE CONSTRUCTION OF KANESHIE FIRST LIGHT, GBAWE AND MALLAM JUCTION STORM WATER DRAINAGE SYSTEM

  • 2022-07-27 16:04:31

The project was aimed at preventing flooding through the channeling of runoffs and flow from major streams and rivers upstream safely into the major water bodies within the catchment areas and finally through the outfall into the open sea. A total of 5 km lined and culvert drains was constructed to minimize the impact of flooding within the communities and improve sanitary conditions.